We test before we quote.
Moisture, hardness and existing coatings are measured on your slab — not estimated from a photo. Your quote is built on what we find, and you get the readings.
Most coatings don't fail because of the coating. They fail because nobody looked at the concrete underneath. So before we sell you anything, we make you a few promises.
Moisture, hardness and existing coatings are measured on your slab — not estimated from a photo. Your quote is built on what we find, and you get the readings.
Every floor is diamond-ground and every crack repaired. We don't acid-wash and hope, and we never coat over a problem to hit a schedule.
It adds a day to most jobs. It's also why our floors are still on the ground years later.
Thickness, temperature and cure times follow the manufacturer's data sheet — and we log them on your job so you can see it was done right.
No subcontractors. The people who test your slab are the people who grind it, coat it and walk it with you.
Your written warranty arrives with the walkthrough. If something we installed doesn't hold up, we come back and make it right.